Underground Projects

More Projects
- METERING STRUCTURE - Braidwood WWTP - Braidwood, IL
- TUNNELS - IDOT Contract 63450 - Deerfield, IL
- BACKWASH TANK - Godley Public Water District - Godley, IL
- DROP PIPE STRUCTURE - Calumet Area Sewer System - Calumet, IL
- JUNCTION CHAMBER - O'Hare Modernization Project - Chicago, IL
- DOGHOUSE MANHOLE - Lake Side Substation Replacement - Milwaukee, WI
- COMED ELECTRIC MANHOLES - Deer Run Industrial Park - Joliet, IL
METERING STRUCTURE - Braidwood WWTP
Braidwood, IL
Customer: Thieneman Construction, Inc.
Installation Date: Fall 2011
Product: 14’-0” x 12’-0” x 16’-2” ID RAS Metering Structure
Location: Braidwood Waste Water Treatment Plant
Description: UCP provided a precast concrete Return Activated Sludge and a Waste Activated Sludge Metering Vault for the expansion of Braidwood’s sewage plant. These structures are used for the increased wastewater treatment which allows the city’s system to process approximately 2 million gallons daily.